Site icon Vocal Pakistan

WAPDA Introduces Project Allowance with Updated Rates for Development and Completed Projects-Notification

Notification / OM No.

No. FO(B&F)/3-63(A)/Vol-12/2181-2200

Dated:

26-July-2024

Notification Issued By:

Office of General Manager Finance (Coord:) Finance Division (Regulations), Pakistan Water and Power Development Authority

Pakistan Water and Power Development Authority

Office of General Manager Finance (Coord:)

Finance Division (Regulations),

225-WAPDA House. Lahore

No. FO(B&F)/3-63(A)/Vol-12/2181-2200                                                                             Date. 26.07.2024

OFFICE ORDER

Subject:-          GRANT OF PROJECT ALLOWANCE  

Ref:-                This Division’s 00 No FO(B&P)/3-63(A)N01-8/671-770 dated 20 09 2019

In continuation to above referred order, the Authority has been pleased to rename the existing Construction Development Allowance as Project Allowance alongwith following amendments regarding admissibility of said allowance:-

i- The Project Allowance, as per rate notified vide this division’s O.O under reference, will only be admissible at the development stage of the project, whereas, employees of completed projects will be entitled to Generation Allowance @ 20% of pay subject to maximum of Rs 20,000/. P.M and Hard Area Allowance at half of existing rate as per zone of the projects in lieu of Operation Hardship Allowance

ii. a.     The existing employees of respective projects will be allowed Project Allowance as per zone wise rates of the projects and same will be frozen at drawn level for those getting said allowance beyond the specified maximum ceiling

b.    The employees of liaison offices (Other than PD offices) of relevant projects will be allowed Project Allowance at half rate of Project Allowance of relevant zone and same will be frozen at drawn level for those getting said allowance beyond the half of specified maximum ceiling.

iii. The employees newly posted/transferred to the projects will be allowed Project Allowance as per existing rate subject to following maximum ceiling:-

BPSMaximum Celling (Rupees P/M)
Zone AZone BZone CZone D
111,00010,0008,0006,000
211,60010,6008,5006,400
312,60011,5009,2006,900
413,50012,3009,8007,400
514,60013,20010,6007,900
615,60014,20011,3008,500
716,50015,00012,0009,000
817,50015,90012,8009,600
918,60016,90013,50010,100
1019,70017,90014,40010,800
1121,10019,10015,30011,500
1222,70020,60016,50012,400
1324,50022,30017,80013,400
1426,70024,30019,50014,600
1529,50026,80021,40016,100
1634,10031,00024,80018,600
1743,60039,60031,70023,800
1854,70049,70039,80029,800
1973,20066,60053,30039,900
2082,10074,60059,70044,800

iv.Theemployees newly posted/transferred to liaison offices (Other than PD offices) of the relevant projects will be allowed Project Allowance at half rate of Project Allowance of relevant zone subject to maximum of half of above ceiling or Liaison Office Allowance at par of Head Office Allowance whichever is beneficial.

v. Project Allowance allowed to specific category of employees or offices on protection basis vide Office Order under reference is hereby discontinued.

2.                     This order is effective from 01.07-2024

Manager A&F (Regulations)